Sign In | Join Free | My enlightcorp.com |
|
Brand Name : Yuanda Boiler
Model Number : DZL
Certification : SGS,CE,ASME,ISO9001
Place of Origin : Henan,China
MOQ : 1 set
Price : Be negotiated
Payment Terms : D/P, L/C, T/T, D/A
Supply Ability : 1500 sets per year
Delivery Time : 20 working days
Packaging Details : Wooden box for boiler accessories.
Product name : Water Tube Coal Hot Water Boiler Biomass Bagasse Fired Hot Water Boiler
Design fuel : coal,biomass,bagasse
Color : Silver,red
Operation : Automatic operation
Quality : High strict detection test
Boiler working life : More than 20 years
Boiler pressure : 1.25MPa, 1.5MPa
Company : boiler manufacturer since 1956
Water Tube Coal Hot Water Boiler Biomass Bagasse Fired Hot Water Boiler
1. Fuel:coal,biomass pellet
2. Capacity: 1ton - 20ton
3. Item: Automatic chain grate, running safety,automatic operation
4. Boiler model:SZL,DZL
SZL biomass coal fird hot water boiler
Boiler model | Rated thermal power | Rated pressure | Rated outlet temp | Return water temp | Design efficiency | Water volume | Weight | Dimension |
MW | Mpa | ℃ | ℃ | % | ㎡ | Ton | mm | |
SZL1.4-0.7/95/70-AII | 1.4 | 0.7 | 95 | 70 | 81 | 211 | 17 | 4850×2690×3462 |
SZL2.8-0.7/95/70-AII | 2.8 | 0.7 | 95 | 70 | 81 | 423 | 22 | 5450×3040×3462 |
SZL4.2-1.0/95/70-AII | 4.2 | 1 | 95 | 70 | 81 | 8.2 | 25 | 6100×3400×3500 |
SZL5.6-1.0/95/70-AII | 5.6 | 1 | 95 | 70 | 81 | 10.7 | 29 | 6800×3400×3500 |
SZL7-1.0/115/70-AII | 7 | 1 | 115 | 70 | 82 | 13.8 | 31 | 7600×3400×3500 |
SZL10.5-1.0/115/70-AII | 10.5 | 1 | 115 | 70 | 82 | 17.6 | 42 | 9800×3400×3540 |
SZL14-1.0/115/70-AII | 14 | 1 | 115 | 70 | 82 | 24.6 | 50 | 11000×3400×3540 |
SZL17.5-1.0/115/70-AII | 17.5 | 1 | 115 | 70 | 83 | 31 | 52 | 8300×3000×3600 |
1.Design the cyclone chamber inside the chamber of the stove
When the high temperature smoke through the cyclone chamber,smoke rotate with high speed and burn thoroughly.Improve the heat efficiency of boiler,the big dust settle down ,achieve the result of secondary combustion and first dust removal.
Energy conservation,high efficiency,environment friendly
This design obtains national patient
2.Separate wind chamber structure
Make air regulation sensitive and make wind uniformly in landscape orientation in the reliable longitudinal wind chamber.
Resolve the wind plug,wind channeled,partial burn phenomenon,
The design obtains national patent.
DZL coal biomass fired hot water boiler
Boiler model | Rated thermal power | Rated pressure | Outlet temp. | Return water temp. | Grate effective area | Design efficiency | Fuel consumption |
MW | MPa | ℃ | ℃ | ㎡ | % | Kg/h | |
DZL0.7-0.7/95/70-AII | 0.7 | 0.7 | 95 | 70 | 1.85 | 80 | 110 |
DZL1.4-0.7/95/70-AII | 1.4 | 0.7 | 95 | 70 | 3.4 | 80 | 222 |
DZL2.8-0.7/95/70-AII | 2.8 | 0.7 | 95 | 70 | 5.18 | 80 | 432 |
DZL4.2-0.7/95/70-AII | 4.2 | 0.7 | 95 | 70 | 7.55 | 81 | 633 |
DZL5.6-1.0/95/70-AII | 5.6 | 1 | 95 | 70 | 9.34 | 80 | 855 |
DZL7-1.0/115/70-AII | 7 | 1 | 115 | 70 | 12 | 80 | 1068 |
DZL10.5-1.0/115/70-AII | 10.5 | 1 | 115 | 70 | 18 | 81 | 1587 |
DZL14-1.0/115/70-AII | 14 | 1.25 | 130 | 70 | 22.85 | 81 | 2116 |
DZL21-1.25/130/70-AII | 21 | 1.25 | 130 | 70 | 27.5 | 81 | 3160 |
DZL29-1.25/130/70-AII | 29 | 1.25 | 130 | 70 | 34.5 | 81 | 4327 |
1. Return water eject to the high temperature tube plate
F: Improve the flow rate of high temperature tube plate and prevent subcooled boiling
P:prevent the tube plate cracking
2. Ejector pipe
F:Increase the flow rate of water on water cooling wall in order to prevent subcooled boiling
P:To prevent pipe explosion,Increase the reliability of water cycle
3. Smoke and dust separator chamber
F:Separate smoke and dust according to inertia
P:reduce the original effluent concentration of soot
4. Optimized design CAD
F:Choose the best furnace from dozens of options
P:improve economical efficiency
5. Convex tube plate
Function:improve tube plate flexibility,so as to reduce the heating stress of welded sew at the pipe end
Purpose:prevent tube plate cracking, cancel bracing,simplify the structure
6. Large size of simple circulation loop drop pipe and lower set box
F:Increase the flow rate of water on water cooling wall in order to prevent subcooled boiling
P:To prevent pipe explosion,Increase the reliability of water cycle
![]() |
Water Tube Coal Hot Water Boiler , Biomass Bagasse Fired Hot Water Boiler Images |